Limited space for installation of new air conditioning system on university building. Grove GMK is the best option in terms of capacity. Grove GMK A compact t Crane. With 68m main boom. Page 2. Terranova Group, Mytchett Road, Camberley, Surrey, GU16 6ET. Telephone All Terrain Mobile Crane | GMK Back to All Terrain. HOME. PRODUCTS. GMK KEY SPECIFICATIONS. TYPE, VALUE. Capacity, t, Capacity.

Author: Taujora Gogore
Country: Kosovo
Language: English (Spanish)
Genre: Spiritual
Published (Last): 23 October 2017
Pages: 20
PDF File Size: 9.49 Mb
ePub File Size: 16.97 Mb
ISBN: 560-7-67083-198-4
Downloads: 82907
Price: Free* [*Free Regsitration Required]
Uploader: Kazralkree

Although 7 hours were initially allocated for the work, in the end the whole project was wrapped up in just 4 hours. Separate electronic hydraulic steer by wire steering of the 4th, and 5th axle line for all wheel steering and crabbing.

All Terrain Mobile Crane | GMK5220

Founded 520The Manitowoc Company, Inc. Two speed transfer case with inter-axle differential lock. Dual circuit, hydraulic power assisted steering with emergency steering pump.

Aluminium, gml vision, tiltable approx. An on-site audience was also in attendance, as senior engineering students from the university were invited to watch the installation work.

Aluminium, 2-man-design, safety glass, driver seat with pneumatic suspension, engine-dependent hot water heater. Load moment and independent anti-two block system with audio visual warning and control lever lock-out. Reach can be extended to up to m through the addition of jib attachments. Electronic level indicator with automatic levelling system.

  JASON BEDUHN TRUTH IN TRANSLATION PDF

Download Image Hi-res Low-res. The five-axle Grove GMK has a t maximum capacity and a 68 m main boom. Axle lines 1, 2, 3 and 5 steer on highway steer by wire. Ravago recommended the crane not only because it had the strength, reach and maneuverability to make the lifts, but also because it was fast enough to complete the job inside a day. All wheels with independent hydropneumatic suspension and hydraulic lockout. On the day there were over 30 people from both Ravago and AsiaE working on the set up for the technical set of lifts.

Two stage transfer case with inter-axle differential lock. AsiaE calculated that the installation of the new aircon system would require three lifts, each of 14 t, to install the chiller plus another lift to position the 3 t of additional accessories, all of which would be lifted to the top of the building.

Back to All Terrain. Allison automatic SP, 6 forward and 1 reverse speed. Full electronic control of all crane movements using electrical control levers with automatic reset to zero. The contractors in questions were, Ravago Equipment Rentals Inc. AsiaE was the 55220 and delivery contractor, while Ravago, which is a multi-discipline industrial company, supplied the crane from its large rental fleet — one of the biggest in The Philippines. Independent horizontal and vertical movement control on each side of the carrier and from the operators cab.

  DERECHO CONSTITUCIONAL MEXICANO IGNACIO BURGOA ORIHUELA PDF

Complete instrumentation and driving controls.

The crane is also relatively gkm, with a 3 m width, and at the Far Eastern University site that was a plus. One by one, each lift was completed and all went exactly to plan, with no damage to any surrounding object despite the highly congested working area. Andy Gagarin, project manager with Ohms-Psi Construction Trading, said the smoothness of the installation process prompted some celebrations on the project. Manitowoc Direct Login Request Access.

Grove GMK Mobile crane used FI / LXLJPA

However, the roads surrounding the building were so narrow that even though the GMK was compact enough to access the lift site, in order to extend its outriggers AsiaE had to get special permission from the local council to dismantle some barriers. Subscribe to the latest Manitowoc news. ECOS system with graphic display. Special 5-axle chassis, all-welded torsion-resistant box type construction in high strength steel.

The crane operator set the lifting parameters in accordance with the engineering plans and the three lifting points for the chiller and accessories were set. Longitudinal and transverse level control with automatic onhighway levelling system. Ergonomically arranged instrumentation and crane operating controls.